Skip to main content
Caesarstone AuthorizedTSSA$5M Liability
Freshly installed white quartz kitchen countertop with an undermount sink in a Toronto home
Priority Hub 2-3 Wk InstallWorkmanship WarrantyCaesarstone + Cambria Authorized

Countertop Installation Toronto, ON

Countertop installation in Toronto, for quartz countertops in Etobicoke bungalows and Scarborough family kitchens alike, starts with Proliner laser templating after your cabinets are set and ends with you walking the finished counter before the last payment.

  • Proliner laser templating to 1/16 in
  • In-house CNC in our 20,000 sqft shop
  • 25/50/25 payment, no consultation fee
  • $5M liability, WSIB, TSSA
Fast Turnaround CAD Service

Get a FREE CAD Quote

Tell us about your kitchen, we send a CAD estimate within 1-2 business days.

Strict privacy. Direct Red Seal review. No spam ever.

17+
17+ Yrs Fab
Toronto and GTA
1.8K
1,800+ Kitchens
400+ bathrooms too
CS
Caesarstone Authorized
Cambria since 2010
15Y
Workmanship Warranty
Fabrication + Install
$5M
$5M Liability
TSSA + NSF installs
WSIB
WSIB Covered
Certificates on request

Countertop Installation Done Right the First Time

Quartz countertops in Toronto are only as good as the install. We see beautiful Caesarstone and Cambria slabs ruined by seams over dishwashers, unsupported overhangs and tops templated before the cabinets were finished. Countertop installation is where the slab meets your house, and our crews are built to get that moment right in Etobicoke bungalows, Scarborough family kitchens and downtown condos alike.

Every installation includes Proliner laser templating, old top removal, setting and levelling, colour-matched epoxy seams, steel brackets where overhangs need them and same-day reconnection of your sink, faucet and cooktop. A Red Seal fabrication lead oversees every project. Our crews are WSIB covered and the company carries $5M liability insurance, and we work to TSSA requirements.

Types of Countertop Installation We Handle

  • Full kitchen installs. New cabinets, new counters, templated after the cabinets are set. See kitchen countertops.
  • Replacement installs. Old laminate, tile or granite out, new stone in, often on your existing cabinets. See countertop replacement.
  • Bathroom vanities. One-day vanity top swaps with sink and faucet reconnection. See bathroom countertop installation.
  • Waterfall islands. CNC-mitred legs set plumb and square with recessed overhang steel.
  • Commercial installs. After-hours and overnight installs for restaurants, clinics and multi-unit projects.
  • Fabrication only. Your slab, our CNC and crew, for $42-$68 per sqft.

Installation Cost Guide

ItemPriceNotes
Installed standard quartz$65 - $120 / sqftTemplating, fab, edge, one sink cutout, install
Installed Caesarstone / Cambria$110 - $180 / sqftSample board matched to slab yardage
Installed Calacatta porcelain$90 - $150 / sqftMitred aprons recommended
Installed granite$70 - $140 / sqftSealed on install day
Fab + install, your slab$42 - $68 / sqftSlab inspected on arrival
Laminate removalIncludedHaul-away included
Stone removal$150 - $350 flatDepends on sink reconnection

All prices are published before any deposit. You pay 25% at templating, 50% at fabrication start and 25% after the install-day walk-through. See the full quartz pricing breakdown.

What Must Be Ready Before Templating?

Most bad installs start with an early template. We only bring the Proliner once:

  1. Cabinets are installed, levelled and fixed to the wall.
  2. Sinks and faucets are on site, so we template the real bowl, not a spec sheet.
  3. Appliance specs are final, especially cooktop and slide-in range dimensions.
  4. Backsplash walls are finished, or at least boarded and flat.
  5. Any plumbing or gas relocation is complete.

If a builder asks us to template earlier to save a few days, we say no. The re-fit costs more than the wait. Our countertop templating page explains the Proliner process in detail.

How Install Day Works

Morning: protect and remove. We cover floors and cabinet faces, disconnect the sink and remove the old top. Laminate removal is included; stone removal is quoted at $150-$350.

Level and support. We check level across every run. Cabinets within about 1/8 inch over 10 feet get shimmed. Any overhang over 10 inches gets steel flat-bar brackets recessed into the cabinet rail, so you cannot see them from below.

Set and seam. Pieces are set on a silicone bed. Seams are joined with two-part epoxy tinted to your slab colour and pulled flush with seam setters. Seams sit where the plan says: behind the range, at an inside corner or along the island edge.

Reconnect. Undermount sinks are clipped and epoxied, then we reconnect the faucet, P-trap and dishwasher drain and set the cooktop.

Walk-through. We clean up, run water, check for leaks and walk the counter with you. Only then is the final 25% due.

Why Overhangs and Seams Decide Your Warranty

The two failure points we see most are cracked overhangs and opened seams. Quartz cantilevered past 12 inches without steel cracks under load. A seam over a dishwasher flexes and takes steam every cycle, so it opens within months. Our workmanship warranty, covers our seams and our supports because we control where they go. That is also why we do not warranty tops cut by other shops.

Condo and Commercial Installation Logistics

Downtown and lakeshore towers add steps. We book the freight elevator, size slabs and seams to the elevator cab and send WSIB and $5M liability certificates to property management. For restaurants, we install overnight and leave the space ready for service; our Queen West prep station job was done after close. See commercial countertops.

DIY vs Professional Countertop Installation

DIY can work for butcher block. It does not work for stone. A 3cm quartz slab weighs roughly 20 pounds per square foot, so a single island piece can top 400 pounds. Seams need tinted epoxy and seam setters, undermount sinks need clips rated for the load and a cracked corner during carry-in wastes the slab. Our crews handle that weight every day, and we carry the insurance if something goes wrong.

Book Your Countertop Installation

Use the form at the top of this page to send your kitchen size, material and timeline. We reply with a CAD estimate within 1-2 business days. Whether you are in Etobicoke, Scarborough or anywhere else in the GTA, the price and the 2-3 week schedule are the same.

The Beaches Installation

near Kew Gardens

BEFORE Before: old granite countertop with an open seam over the dishwasher
AFTER After: new quartz countertops with the seam moved behind the range

A 1920s Beaches home had an old granite with a seam that sat directly over the dishwasher. Every cycle, steam opened the seam and the owners had resealed it twice. We moved the new seam behind the gas range (hidden by the hood) using a Proliner laser template to confirm it worked with the cabinet layout. Removal of the old granite in the morning, new Caesarstone 5110 set and sealed with two-part epoxy by late afternoon, undermount sink reconnected before dinner.

Price
$7,900 installed
Turnaround
Same-day removal + install
Size
32 sqft perimeter + undermount sink
Materials
Caesarstone 5110 Alpine Mist, two-part epoxy seams
View more projects →

Recent Installation Projects

Colour-matched epoxy seam on a quartz countertop behind a range
Seam behind the range, colour-matched epoxy
Recessed steel brackets in an island cabinet rail before a quartz overhang install
Steel brackets for a 14-inch overhang
Undermount sink reconnected under a new quartz countertop
Etobicoke, sink and faucet reconnected same day
Scarborough kitchen with new quartz countertops installed on original cabinets
Scarborough, laminate out and quartz in, one day
CAD estimate within 1-2 business days

Request a Free CAD Quote for Installation

CAD estimate within 1-2 business days. No consultation deposit.

  • Per-sqft pricing before deposit
  • 25/50/25 payment
  • workmanship warranty
(647) 252-9828Get Free CAD Quote